Case Study

Case Study – 135 MW Thermal Power Plant

The cost of reduced heat loss was not considered. The temperature is expected to reduce by 30 – 40oC

Case Study of Waste Heat Recovery Boiler in India

3 MW Boiler in Preheater section of Cement Plant.

Benefits of Airseal

  • Very less ash leakage into penthouse and from other areas
  • Reduced load on Fan
  • Increased efficiency with less coal consumption.
  • Maintenance activity can be done in shorter duration.
  • Easier removal for mechanical maintenance as compared to Refractory Lining.